CASE STUDY DATABASE
Add Story | Search Case Studies
Chevron Chemical Company
Year Submitted: 2003 |
Process: Cleaning with Wash Oil |
Industry: Chemical Manufacturing |
Wastes Reduced: Benzene |
Substance: Contaminated Coke Sludge |
Location: Cedar Bayou Plant, Baytown TX |
No. of employees: 960 |
Contact: Joe Ross |
Phone: (713) 421-6559 |
Description:
1
P2 Application:
1
Environmental Benefits:
This process produced 146 tons of hazardous waste in 1994. As a result of this change, the waste is no longer classified as a hazardous waste.
Video: 1 |
Details of Reductions
Additional Information :
1