CASE STUDY DATABASE
Add Story | Search Case Studies
Atlas Copco
Year Submitted: 2010 |
Process: Lighting Upgrade |
Industry: Construction and mining equipment |
Wastes Reduced: Electricity |
Location: Garland TX |
No. of employees: 372 |
Contact: Jim Bowrey |
Phone: 972 496 7477 |
Description:
1
P2 Application:
1
Video: 1 |
- Total Cost Savings: $141,500.00
- Comments: All lighting upgrades resulted in a payback period of less than 1 year. Savings were calculaed at a rate of 12 cents per kWh at the time of installation and may vary depending on rate fluctuations.
Details of Reductions
- Electricity
Comments: Reduced electrical usage by 1.18 million kWh
Additional Information :
1